Factory Introduction & Capacity

Our new factory is located in Yecheon-gun, Gyeongsangbuk-Do. This is newly cutting edge automated beverage manufacturing facility with 3 warehouses which has the capacity of manufacturing 525,600,000 bottles year with total size 28,700 ㎡.

 

It shows as specialized global beverage manufacturer which is able to process multi packaging.

Besides basic PET line, we have carbonation system, non-carbonation system for soft drinks, wide cap system, half tray packing system, shrink packing sytem, etc.

 

Also, we are able to process ‘Push-Pull Cap’ products which are used for kids’ drinks.

공장라인.jpg
공장라인-2.jpg
공장동-야외.jpg

Factory Profile

Address

13-3 Sandan-gil, Bomun-myeon, Yecheon-gun, Gyeongsangbuk-do, Korea

Scale

Land - 28,700 ㎡

Product line - 10,000 ㎡

Ware house scale Ⅲ - 9,000 ㎡

Capacity

Capacity

 Daily Productivity

daily-productivity.png

- 1,440,000 btls (24 hours) 500 BPM X 60min X 24Hr X 2 Line)

 Annual Productivity

annual-productivity.png

- 525,600,000 btls (365 days) (500 BPM X 60min X 24Hr X 365 Days X 2 Line)

Production Facility

Productution Facility

01. Raw Material Inspection

Compliance of raw materials for product production

연구-검수.jpg
Mixing 2.jpg

02. Mixing

HTST (High Temperature Short Time) 

for mixed material

03. Sterilization

Holding for minute for Srerilization

Sterilization_edited.jpg
Bottle-input.jpg

04. Bottle Input

Entering to the filling line

05. Filling

Filling togerther into PET bottle which already rinsed

filiing_edited.jpg
06-line-inspection_edited.jpg

06. Line Inspection

Camera Inspection Systems catches automatically

the default of capping.
At the same time, QC inspectors double-check capping condition as the way of all-in-one quality assurance program 

07. Sterilization

After cap sterilization, the product is allowed to cool to the appropriate temperature

07steriliztion_edited.jpg
Printing-shelf-life.jpg

08. Printing Shelf Life

Production date and expiration date on the produced product

09. Packing

Packaged in units of each product

packaging_edited.jpg
Microbiological-Examination_edited.jpg

10. Microbiological Examination

After production, the microbiological examination

11. Container Loading

The products produced are stored into a warehouse for container shipment

Container-loading.jpg